| Application Compatibility | Confirm whether the diverter is designed for dry bulk solids, liquids, powders, granules, packages, or conveyor applications. | Supplier provides a written compatibility statement, flow diagram, and application references for the intended material and duty cycle. | 15% | ___ |
| Flow Capacity and Port Size | Compare nominal port diameter, flow rate, pressure drop, and allowable product velocity. | Technical datasheet includes dimensional drawings, flow coefficient or capacity data, and operating limits for each available size. | 10% | ___ |
| Pressure and Temperature Range | Check maximum working pressure, design pressure, operating temperature, and any vacuum rating. | For industrial designs, request pressure-temperature tables rather than relying only on a single headline rating. | 10% | ___ |
| Actuation and Switching Performance | Evaluate pneumatic, electric, hydraulic, or manual override options, including response time and cycle life. | Request tested switching time, rated cycles, actuator torque or force, fail position, and emergency manual operation details. | 10% | ___ |
| Materials and Wear Resistance | Match body, rotor, seals, liners, and fasteners to corrosion, abrasion, hygiene, and temperature requirements. | Common verification items include stainless steel grade, elastomer type, surface finish, replaceable liners, and documented material certificates. | 10% | ___ |
| Leakage, Sealing, and Containment | Review internal leakage, external sealing, dust containment, cross-contamination risk, and cleaning requirements. | Require the applicable leakage test method, seal specification, inspection record, and maintenance procedure. | 10% | ___ |
| Automation and Control Integration | Confirm compatibility with PLCs, sensors, control valves, remote I/O, limit switches, and plant communication protocols. | Preferred documentation includes wiring diagrams, I/O lists, feedback signals, solenoid specifications, and available communication interfaces. | 10% | ___ |
| Safety and Regulatory Documentation | Determine which legal and safety requirements apply in the destination market and industry. | Check risk assessment, declaration of conformity where applicable, machinery safety documentation, electrical files, and hazardous-area certificates when required. | 10% | ___ |
| Quality Management and Traceability | Assess process control, inspection procedures, nonconformance handling, and component traceability. | ISO 9001 certification is useful evidence, but buyers should also request inspection plans, test reports, serial-number records, and audit rights. | 8% | ___ |
| Customization and Engineering Support | Evaluate the supplier’s ability to adapt dimensions, connections, materials, controls, and installation requirements. | Ask for certified drawings, 3D models, interface schedules, sample calculations, and a defined technical approval process. | 7% | ___ |
| Lead Time and Production Capacity | Compare engineering lead time, manufacturing lead time, inspection time, and spare-parts availability. | Obtain a written schedule with milestones, capacity assumptions, incoterms, packaging method, and delay-management procedures. | 5% | ___ |
| Lifecycle Cost and Serviceability | Compare purchase price, utilities, wear parts, maintenance labor, downtime exposure, and expected service intervals. | Request a recommended spare-parts list, maintenance schedule, warranty terms, service contacts, and total-cost-of-ownership estimate. | 5% | ___ |