| Predominantly linear motor and transformer loads | 0.80–0.90 lagging | Usually below 5% | Induction motors, transformers, heaters, and conventional lighting | Standard shunt capacitor bank may be suitable when the resonance study is clear. | Reactor may not be required, but system impedance and background harmonics should be verified. | Automatic stepped switching is normally suitable for variable production schedules. | Check minimum load, transformer capacity, existing capacitors, and the risk of leading power factor during lightly loaded periods. |
| Variable-frequency-drive dominated process | 0.75–0.90 lagging, depending on drive type and loading | Approximately 25–45% for many six-pulse drives without harmonic mitigation | Rectifier front ends in motor drives and DC-link converters | Use a harmonic-resistant, detuned capacitor bank rather than an ordinary non-detuned bank. | Common detuning choices include approximately 5.67% or 7%; the final value requires a resonance and harmonic assessment. | Use staged switching with discharge resistors and switching delays suitable for frequent load changes. | Review drive quantity, drive ratings, short-circuit strength, transformer impedance, and total harmonic voltage distortion. |
| Uninterruptible power supply and data-processing loads | 0.80–0.95 lagging or near unity, depending on rectifier design | Approximately 5–40% | UPS rectifiers, switched-mode power supplies, servers, and battery chargers | Use detuned correction only after confirming the UPS input characteristics and generator operating mode. | Detuning is often appropriate where nonlinear loads are significant; confirm compatibility with bypass and generator operation. | Use fast but controlled automatic steps; avoid excessive switching during rapid load fluctuations. | Check generator capacity, UPS input power factor, bypass operation, neutral loading, and harmonic limits at the point of common coupling. |
| Welding machines, arc furnaces, and rapidly fluctuating loads | 0.60–0.85 lagging | Approximately 20–60%, with possible rapid variation | Arc equipment, welding rectifiers, and power-electronic converters | Consider dynamic compensation, such as switched electronic compensation or a power-quality system, instead of a fixed capacitor bank. | Do not select detuning from THDi alone; perform a detailed frequency scan and evaluate voltage distortion. | Use fast-response control with adequate switching endurance and current-limiting protection. | Assess flicker, voltage fluctuations, interharmonics, unbalance, short-circuit level, and the speed of reactive-power changes. |
| Commercial buildings with LED lighting and electronic equipment | 0.85–0.98 lagging, depending on equipment quality and operating level | Approximately 10–30% | LED drivers, computers, displays, office power supplies, and small HVAC drives | Use a small stepped bank only after measuring the aggregate load profile and harmonic spectrum. | Detuned capacitors are advisable when the building has substantial nonlinear load or a high density of electronic equipment. | Use automatic steps sized for low daytime and nighttime demand to prevent overcorrection. | Check minimum demand, third-harmonic current, neutral conductor loading, and the effect of standby generators. |
| Mixed industrial facility with changing production schedules | 0.75–0.95 lagging | Approximately 10–40% | Motors, transformers, drives, welders, lighting, and power supplies | Use a measured, automatic, detuned bank when nonlinear loads are material; combine with harmonic filtering if necessary. | Select the detuning percentage from a network study, not from a standard value alone. | Use multiple steps with load-dependent control, switching interlocks, and alarms for abnormal voltage or current. | Measure at least one representative operating cycle, including maximum production, minimum load, and major equipment start-up. |
| Facility supplied by a standby generator | 0.80–0.95 lagging before correction | Depends on connected nonlinear loads and generator impedance | Drive rectifiers, UPS systems, electronic lighting, and generator voltage-regulator interactions | Use generator-compatible, automatically controlled correction with conservative switching limits. | Verify resonance separately for utility and generator operation because generator impedance is typically higher. | Interlock or reduce capacitor stages during generator operation when required by the system study. | Check generator kVA, transient stability, minimum loading, excitation-system limits, and leading power-factor tolerance. |