Before horizontal directional drilling (HDD), map the bore against actual site conditions, not just a straight line on a screen. Gather available utility records and arrange a field locate to mark buried services. Check entry and exit areas, nearby structures, and clearance at each crossing. Records may be incomplete, so treat them as clues rather than proof. Small details matter.
Ground conditions influence the route and drilling plan. Review geotechnical information for soil layers, rock, groundwater, and possible obstructions. Where information is limited, targeted site investigation can reduce uncertainty. Set the intended alignment with practical depth and bend limits in mind, and confirm that the exit point is accessible for receiving the drill head. A carefully drawn route can still miss local changes in soil; revise it when field evidence calls for a closer look.
Tips: Walk the alignment before work begins. Compare marked utilities with the plan, and pause if locations conflict. Do not guess. Document changes so the crew works from the same, current route.