| 1 | Confirm critical dimensions | Identify functional dimensions, datum features, hole locations, and sealing surfaces before requesting a quotation. | Apply ±0.01 mm only to clearly defined critical features; use wider tolerances for non-functional dimensions where possible. | Review a dimensioned 2D drawing and GD&T scheme with the supplier before tooling begins. |
| 2 | Check tolerance capability | Require evidence that the automated molding process can repeatedly hold the specified tolerance. | For a ±0.01 mm target, request capability data such as Cpk ≥ 1.33 when statistically justified and agreed in advance. | Review capability studies, control charts, first-article results, and measurement-system analysis. |
| 3 | Match material grade to function | Specify the polymer family, reinforcement, colorant requirements, flame rating, and applicable regulatory requirements. | Use an exact generic grade description, such as unfilled PC, 30% glass-filled PA66, or acetal copolymer, rather than only “engineering plastic.” | Request the material technical data sheet, certificate of analysis, lot traceability, and identification of regrind content. |
| 4 | Evaluate shrinkage and warpage control | Consider material shrinkage, fiber orientation, wall-thickness changes, cooling balance, and gate location. | Typical linear molding shrinkage may range from approximately 0.5% to 2.0%, depending on polymer, grade, flow direction, and processing conditions. | Review mold-flow analysis, dimensional study results, and inspection data from parts produced after conditioning. |
| 5 | Verify drying and moisture control | Require controlled drying for hygroscopic materials and documented resin-handling procedures. | PA, PC, PBT, PET, and PEEK commonly require pre-drying; the exact temperature, time, and moisture limit must follow the material supplier’s data sheet. | Check dryer records, dew-point readings, material exposure time, and moisture test results where applicable. |
| 6 | Assess machine and mold precision | Confirm that the machine, mold base, cavity inserts, slides, ejectors, and temperature-control system are suitable for the tolerance target. | For ±0.01 mm features, prioritize stable process control, precision mold components, consistent cooling, and minimal cavity-to-cavity variation. | Review machine calibration, mold-maintenance records, cavity balance, and dimensional results by cavity. |
| 7 | Define inspection equipment | Specify the measurement method, resolution, environmental conditions, and inspection frequency for critical dimensions. | Use calibrated CMM, optical measurement, or suitable gauges; measurement resolution should be sufficiently finer than the ±0.01 mm tolerance. | Request calibration certificates and a gauge repeatability and reproducibility study for critical measurements. |
| 8 | Set process-validation requirements | Require documented approval of molding parameters, first articles, and production samples before release. | Validate fill, pack, hold, cooling, mold temperature, barrel temperature, cycle time, and part-conditioning requirements. | Review process-validation reports and confirm that approved parameters are protected from unauthorized changes. |
| 9 | Control appearance and defects | Define acceptable limits for flash, sink marks, weld lines, flow marks, burn marks, short shots, and color variation. | Use approved visual standards, defect samples, lighting conditions, viewing distance, and inspection time. | Approve boundary samples and include cosmetic criteria in the purchase specification. |
| 10 | Review production traceability | Require traceability from finished parts to resin lot, mold cavity, machine, production date, and inspection results. | Define retention periods, sampling plans, nonconformance procedures, and change-notification requirements. | Audit batch records, barcode or lot systems, inspection reports, and corrective-action documentation. |