| 1. Confirm the joint design | Identify the composite type, laminate thickness, core structure, mating material, and access conditions. | Verify that the joint can tolerate drilling, clamping, and local bearing loads. | Check for adequate edge distance, access behind the panel, and clearance for the folded rivet legs. |
| 2. Measure the total grip thickness | Add the thicknesses of all sheets, skins, washers, spacers, and approved shims being clamped. | Select a rivet whose published grip range includes the measured total thickness. | Do not use a rivet that is too short, too long, or outside the stated grip range. |
| 3. Select the head style | Choose a large-flange head for soft, brittle, thin, or sandwich composite surfaces. | The head should distribute bearing pressure without breaking the laminate or crushing the skin. | Confirm that the head diameter does not interfere with adjacent parts or required clearances. |
| 4. Mark and support the work | Mark the hole location and support the panel close to the drilling point. | Prevent panel flexing, delamination, and local core collapse during drilling. | Ensure the marked hole is clear of edges, corners, existing fasteners, and damaged laminate. |
| 5. Drill the hole | Drill a round hole using a sharp, suitable bit at a controlled feed rate. | Use the hole diameter specified for the selected rivet; avoid oversize or oval holes. | Remove loose fibers and inspect for delamination, breakout, resin cracking, or crushed core. |
| 6. Deburr and clean | Lightly remove burrs without enlarging the hole, then clean away dust and chips. | The mating surfaces must sit flush, and debris must not prevent full rivet insertion. | Check that the rivet body passes through the joint without binding. |
| 7. Insert the rivet | Place the rivet through the joint from the accessible side until the flange contacts the outer surface. | The rivet body must pass through all layers, with the correct amount of body extending behind the joint. | Verify that the flange is seated flat and the mandrel is aligned with the rivet axis. |
| 8. Set the rivet | Fit the correct nosepiece and operate the hand, battery, or pneumatic rivet tool in line with the rivet. | Pull the mandrel smoothly until the tri-fold legs form and clamp the joint. | Stop when the mandrel head reaches the designed break point; do not over-stroke the tool. |
| 9. Inspect the formed legs | Examine the rear side when accessible, or use a suitable inspection method for blind locations. | The legs should be evenly formed and should bear against the rear surface without cutting into the panel. | Reject rivets with incomplete folding, tilted heads, spinning bodies, cracked laminate, or excessive crushing. |
| 10. Verify the finished joint | Check head seating, joint tightness, surface damage, and mandrel retention requirements. | The assembly should meet the design requirements for clamp force, shear, vibration, and environmental exposure. | Record the rivet type, diameter, grip range, tool setting, and inspection result for production traceability. |